The floor pans both have rusty areas, but are repairable.
The hole in the n/s floor cut out and a repair section made from new metal, I made a flange on the inner edge and plug welded it in place then seam sealed, and painted with Bonda primer.
Same on the o/s, the rust was cut out and a repair section made, and welded in place.
Once the Castle Rails were removed, it then seemed easier to fit new floor pan edge repair sections, this made it easier to remove the castle rails and also dealt with the rust on the floor pan edges.
No comments:
Post a Comment