MGB GT 1979 Restoration

Friday, 1 November 2013

Work starts on the bodywork:
A general assessment was made and any rust areas exposed to determine the extent of the rust, in some places, such as the o/s/r wing, there was some serious quantities of filler, underneath this was of course rust. 





Posted by mgbgt1979restoration at 16:09
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2016 (2)
    • ►  March (1)
    • ►  January (1)
  • ►  2015 (3)
    • ►  September (2)
    • ►  April (1)
  • ►  2014 (14)
    • ►  October (1)
    • ►  July (1)
    • ►  June (1)
    • ►  May (3)
    • ►  March (2)
    • ►  February (2)
    • ►  January (4)
  • ▼  2013 (11)
    • ▼  November (6)
      • Gearbox Cross member modification. The Rover 5 sp...
      • Gear lever modification. The Rover SD1 gearlever ...
      • MGB V8 Engine trial fitting. Several reasons to d...
      • Cutting out the inner wings for the RV8 exhaust ma...
      • Front inner wings and engine bay repairs:
      • Work starts on the bodywork: A general assessment ...
    • ►  October (5)

Contributors

  • Jack Stocker
  • mgbgt1979restoration
Simple theme. Powered by Blogger.